Provided design for a 48,000-sf facility that houses a 250-seat auditorium theater and a smaller 200-seat black-box style theater. In addition, a two-story portion of the building is used for classroom purposes. The structural system of the building is constructed of steel beams with composite metal design with lateral loads resisted by steel braced frames. Construction costs for this project total $13 million. While with another firm, Chris Thompson served as Principal-in-Charge, and John McDonald served as Project Manager.